Wednesday, February 1, 2012

3 Day Shoot for "Pit Stopping" AP

Here is a very delayed post I wrote right after the Pit Stopping shoot in October:

After a couple months of planning and about six months after the concept and first draft of the script came together I finally got to shoot my Advanced Production project, "Pit Stopping." Though there is still a considerable amount of post work to be done including editing, sound designing, and most likely a couple of other things I'm forgetting about because I'm too tired at the moment, we have finished the three day shooting cycle! It was exciting and nerve-wracking working with Super 16 because this was my first and most likely one of my very few chances to work with film instead of digital, and we had five rolls of 400ft film, which averages to about fifty-five minutes of film total. We were down to the last few feet of film by the end of day three, talk about cutting it close.

I had a great team working with me, I am very fortunate that everyone has been so dedicated and focused on the project. When people started asking at the beginning of the semester if they could work on set for my AP I realized that I've been a little narrow-minded in believing that I hadn't met all that many people while I've been at Chapman and I was definitely happy to work with a lot of friends for this shoot. The crew turned out to be a sizeable one, we had about twenty people on set. I think it's interesting to note that five us working on the film transferred to Chapman just last year: me, the producer, the 1st assistant director, the 1st assistant camera, and the gaffer. We've definitely come a long way from transferring in last fall.

Some of the pictures taken at the shoot.











No comments:

Post a Comment